A set of mutually coordinated designs that give the technical solution for the building and show it meets the basic requirements (mechanical resistance and stability, fire safety, energy saving and others), with architectural, structural, electrical and mechanical parts (Building Act, NN 155/25, Art. 34). For multi-flat and other buildings it is submitted with the building permit application. For a less complex building (manje složena zgrada) it is, from 1 January 2026, prepared after the permit in line with the location conditions set out in the permit: the investor attaches it electronically to the notice of commencement (Art. 89, para. 4) and it must be kept on site (Art. 93). See: Conceptual design (idejni projekt), Less complex building (manje složena zgrada).
A one-off payment to the municipality or town (JLS) towards building municipal infrastructure (Municipal Services Act, NN 68/18). It is calculated per m³ of building volume multiplied by the unit value for the zone the plot is in; balconies and uncovered terraces are not included in the volume (Ordinance NN 15/19). The contribution decision is issued after the building permit becomes final, and it is paid as a one-off (the municipality or town may allow instalments by decision). It is separate from the fees for connection to the networks. See also: Connection fees.
Chapter: 4.1, 4.2
The basic spatial plan of a municipality or town: it sets the building areas, land use and building conditions, such as kig, kis, number of storeys, height, setbacks and the minimum size of a building plot. If a detailed urban development plan (UPU) applies to the area, the more detailed rules are read from it. Under the Spatial Planning Act (NN 155/25), plans adopted under earlier laws are amended only as new-generation plans and cease to be valid within seven years of 1 January 2026 (Art. 238). See: New-generation spatial plan (prostorni plan nove generacije).