LynxCraft · Academy
← Glossary of termsThe inspection of a completed building that the building authority carries out before the use permit, within 30 or 15 days of a proper application (Building Act, NN 155/25, Art. 97 to 98). For a less complex building (manje složena zgrada) only the investor is invited, and the check is whether the building has been built in line with the location conditions in the permit and the conceptual design: use, maximum external dimensions of the above-ground and below-ground parts, shape and size of the plot and the position of the building on it. A deviation of external dimensions of up to 0.30 m is allowed, except from the mandatory building line and the minimum distance from the boundary (Art. 81).