Building permit (građevinska dozvola)

The administrative act that allows you to build; building without it is unlawful. From 1 January 2026 (Building Act, NN 155/25), for a less complex building (manje složena zgrada), such as a family house with at most two flats and up to 400 m² GBP, the application is accompanied by a conceptual design (idejni projekt) and proof of legal interest (Art. 62), and the location conditions are set in the permit itself, with no separate location permit. For larger buildings a main design (glavni projekt) is attached. The application is submitted electronically (eDozvola). The permit lapses if building has not started within six years of it becoming final (Art. 79). Procedures started before 1 January 2026 are completed under the previous Building Act (NN 153/13 and amendments) (Art. 129). See: Conceptual design (idejni projekt), Notice of commencement (prijava početka građenja).

Chapter: 2.6, 5.2, 5.7