Absolute rights transfer tax (porez na prenos apsolutnih prava)

A tax (at a rate of 2.5%) paid on the paid transfer of ownership of land or existing real estate whenever VAT does not apply. By law the seller is the taxpayer, though in practice the buyer usually assumes payment in the contract; first-time home buyers are exempt under statutory conditions.

Adaptation (adaptacija)

Carrying out construction and other works on an existing building that change the internal organisation of the space or replace equipment and installations of the same capacity without affecting structural elements, stability, or external appearance. Generally requires a decision on approval for the execution of works under Article 145 of the Law on Planning and Construction.

Agricultural land (poljoprivredno zemljište)

Land used for agricultural production or which can be brought to that purpose, and which cannot be used for other purposes except in cases and under conditions established by law and the corresponding planning document.

Appeal (žalba)

A regular legal remedy by which a party or an authorised state body challenges a first-instance decision when an appeal is not excluded by law, or which a party files when a decision has not been issued within the legal deadline.

As-built project (projekat izvedenog objekta)

Technical documentation (abbreviated PIO) showing the actual constructed state of the building for the use permit when permitted deviations from the project for building permit (PGD) or project for execution (PZI) occurred during construction.

Auxiliary building (pomoćni objekat)

A building that serves the main building and is built on the same plot on which the main residential, business or public purpose building is built or can be built, such as a garage, storage room, well or septic tank.

BRGP (bruto razvijena građevinska površina)

Gross developed building area: the sum of the areas of all above-ground storeys of a building measured at floor level along the outer faces of enclosing walls (including claddings, parapets and railings). Excludes underground storeys and is used to calculate the floor area ratio.

Building height (visina objekta)

The distance from the zero datum of the building (intersection of the terrain line and vertical axis) to the cornice or ridge level, limited by the planning document for neighbourhood integration and sunlight exposure.

Building line (građevinska linija)

A line set by a planning document on, above and below the ground up to which the basic footprint of a building may be constructed on a building plot.

Building permit (građevinska dozvola)

A decision by which the competent authority permits construction through CEOP based on the project for building permit (PGD) and project extract. Without it, construction is generally illegal (apart from statutory exemptions), and it lapses if works are not notified within three years of legal finality.

Building plot (građevinska parcela)

A part of building land with access to a public traffic area designated by a planning document for construction. When an existing cadastral plot does not meet plan requirements, it is formed through a parcelling or reparcelling project.

Cadastre of utility lines (katastar vodova)

The basic and public register maintained by the Republic Geodetic Authority (Republički geodetski zavod) (today the Cadastre of Infrastructure and Underground Objects, or Cadastre of Infrastructure) regarding above-ground and underground installations such as water pipes and electricity, as well as other infrastructure and underground objects.

CEOP (Centralna evidencija objedinjenih procedura)

Central Registry of Unified Procedures: an electronic information system run by the Business Registers Agency (APR) through which applications for location conditions, building permits, notification of works and use permits are submitted exclusively online.

Concept design (idejni projekat)

A phase of technical documentation (abbreviated IDP) elaborating the building concept in drawings and descriptions, less detailed than the project for building permit (PGD). Prepared for works requiring a decision on approval for execution of works under Article 145 and for complex Article 133 structures subject to expert review. Usually not needed for an ordinary family house: after location conditions, the PGD is prepared directly.

Concept solution (idejno rešenje)

The first phase of technical documentation (abbreviated IDR), showing the basic concept, footprint and siting of the building on a geodetic base, submitted through CEOP to obtain location conditions.

Conclusion (zaključak)

An act by which an authority resolves issues concerning the course of the procedure itself, rather than the essence of the party's rights.

Construction log (građevinski dnevnik)

A record of the progress of works kept by the responsible contractor on the construction site and certified by the professional supervisor, which is mandatory for all buildings except for family residential and other category A buildings and exceptions prescribed by law.

Contract authentication (overa ugovora)

The process of confirming (solemnisation) a private document in which the identity of the signatories and the content of the contract are established (unlike a simple signature authentication which does not include a check of the content) before a public notary, or in a basic court in municipalities where a public notary has not been appointed. Without this act, except when concluded in the form of a public notary deed, a real estate purchase agreement has no legal effect.

Criminal offence (krivično delo)

The most serious form of law-breaking, where the construction or reconstruction of a building without a building permit in Serbia is legally punishable when the law prescribes obtaining a building permit for such works.

Decision (rešenje)

An administrative act issued in writing, or exceptionally orally, by which an authority decides on a right, obligation, or legal interest of a party, such as a building permit decision.

Early public review (rani javni uvid)

A phase in the preparation of a planning document that precedes the public review, intended to familiarise the public with general goals and possible solutions, as well as to obtain conditions and data for the preparation of the plan.

Easement (službenost)

A real right over another person's property that authorises the owner of the dominant property in the case of a real easement, or a specific person in the case of a personal easement, to use another's real estate in a certain way or to require its owner to refrain from certain behaviour.

Energy passport (energetski pasoš)

An official certificate of a building's energy performance issued by an authorised organisation via the Central Register of Energy Passports (CREP). It classifies the building into one of eight energy classes (A+ to G; new buildings must reach at least class C) and is mandatory for obtaining a use permit for new buildings, unless exempt by law.

Floor area ratio (indeks izgrađenosti)

The ratio of the total gross area of all above-ground storeys to the area of the building plot. It determines the maximum gross developed building area of the above-ground storeys of the building on the plot, while underground storeys are not included in this calculation.

Footprint (gabarit)

The external contours and dimensions of the building in plan view which are limited by the urban plan.

Gas network (gasna mreža)

A system of pipes for the delivery of natural gas, which requires strict installation safety measures.

Geosrbija (National Geospatial Data Infrastructure)

The official portal of the national geospatial data infrastructure in Serbia. It allows access to an interactive map of cadastral plots and geospatial layers, while the Agency for Spatial Planning and Urbanism of the Republic of Serbia (Agencija za prostorno planiranje i urbanizam Republike Srbije) is responsible for public insight into spatial and urban plans.

Gross area (bruto površina)

The total area of all storeys of a building (above and below ground), measured along the outer edges of the enclosing walls under standard SRPS U.C2.100. Unlike BRGP, it includes underground storeys.

Guarantee (garancija)

The contractor's obligation to rectify defects in the completed building within the contractual or statutory warranty period after handover. Under the Law of Obligations, the contractor is liable for the structural soundness of a building for ten years from handover.

Information on location (informacija o lokaciji)

An optional informational document issued within 8 days by the competent authority (or exceptionally, on request, by a public notary or registered urban planning firm) setting out construction possibilities and restrictions on a cadastral plot under the current plan.

Institute for Nature Conservation of Serbia (Zavod za zaštitu prirode Srbije)

A state institution responsible for the preservation of natural assets in the Republic of Serbia, except for assets located entirely or mostly within the territory of AP Vojvodina, for which the Provincial Institute for Nature Conservation is responsible. It issues an act on nature protection conditions or prepares a professional basis for areas outside AP Vojvodina.

Landslide (klizište)

Terrain prone to ground movement. Before building, it is essential to check the stability of the ground for the safety of the building.

Legal finality (pravnosnažnost)

The property of a decision that can no longer be challenged by an appeal in administrative proceedings or by a lawsuit in an administrative dispute.

Legalisation (ozakonjenje)

The procedure for recording and registering ownership rights in the real estate cadastre for buildings constructed without a permit, in order to bring them into legal channels. The deadline for submitting an application under the new law expired at the beginning of 2026; subsequently, it is only possible with proof of objective reasons, and a geodetic study is still required when the building is not visible on a satellite image.

Linear object (linijski objekat)

An infrastructure facility (linijski infrastrukturni objekat) extending along a route above or below ground, such as public roads, railways, power lines, gas pipelines, water, sewerage and telecommunications networks.

Location conditions (lokacijski uslovi)

A public document issued through CEOP on the basis of a concept solution (IDR), containing all urban planning and technical conditions for designing and connecting a building to infrastructure. Valid for two years from issuance or until the expiry of a building permit issued under them.

Main volume (glavna sveska)

Part of the technical documentation containing general data about the investor and the building within the CEOP (Central Information System for Unified Procedures) system.

Misdemeanour (prekršaj)

An unlawful act defined by law or other regulation for which a misdemeanour sanction is imposed in proceedings before a misdemeanour court or by a misdemeanour order.

Mortgage (hipoteka)

A security interest in real estate used by a creditor as security for debt repayment. It is entered into the property title deed (list nepokretnosti).

Net area (neto površina)

The total internal area of all spaces between walls and partitions (under standard SRPS U.C2.100), excluding wall and column thickness. It includes usable area, technical rooms and circulation areas (corridors and staircases) and serves as the basis for calculating the land development contribution.

Note (zabeležba)

An entry in the real estate cadastre publicly announcing facts relevant to a property's legal status, such as a pending dispute, prohibition of alienation or registration under a special law.

Notification of works (prijava radova)

A mandatory procedure through CEOP by which the investor notifies the competent authority before construction starts (after the building permit or Article 145 decision becomes legally final, or final at the investor's own risk), submitting proof of settled land development contribution, third-party liability insurance and fee payments.

Ownership (svojina)

The right of an owner to hold, use and dispose of real estate. In Serbia, it is acquired on the basis of a legal transaction by entry into the real estate cadastre, while the right of ownership can also be acquired by law itself, through inheritance or by the decision of a state authority.

Party to the proceedings (stranka u postupku)

A natural or legal person whose administrative matter is the subject of an administrative procedure and any other natural or legal person whose rights, obligations or legal interests may be affected by the outcome of the administrative procedure, as well as an authority, organisation, settlement, group of persons and representatives of collective and broader public interests.

Plot (parcela)

The basic cadastral territorial unit representing a part of the land in a cadastral municipality defined by a boundary and marked with a unique number, on which ownership rights exist. It can be building, agricultural, forest or water land.

Plot area (površina parcele)

The total square footage of land within cadastral boundaries, the starting point for calculating the buildability ratio.

Plot number (broj parcele)

A unique identifier consisting of a number and a possible sub-number of a plot which, within a specific cadastral municipality, identifies a cadastral plot in the real estate cadastre.

Professional manager (profesionalni upravnik)

A licensed person engaged by a residential community through a contract for building management tasks, or appointed by a decision of the competent local self-government body during a compulsory management procedure.

Professional supervision (stručni nadzor)

A licensed person or team monitoring construction on the investor's behalf to ensure compliance with the project and law. Mandatory for permitted buildings except category A buildings, though recommended in practice to control quality and costs.

Project extract (izvod iz projekta)

A mandatory document for obtaining a building permit certified by the lead designer. It contains the PGD main volume, the technical control declaration and key data used by the authority to verify compliance with location conditions.

Project for execution (projekat za izvođenje)

Technical documentation (abbreviated PZI) with details, schematics and specifications for carrying out works on site. Mandatory for all buildings with a building permit except category A buildings (family homes up to 400 m² gross area), though recommended in practice.

Property tax (porez na imovinu)

An annual tax paid by real estate owners, whereby for taxpayers who do not keep business books, the tax authority of the local self-government unit determines the value of the real estate based on the useful area and average prices by zones, while taxpayers who keep business books determine the tax by self-assessment.

Public authority holder (imalac javnih ovlašćenja)

State bodies, bodies of the autonomous province and local self-government, special organisations, public enterprises and other persons exercising public authority or providing services of public interest and issuing requirements for design and connection in the unified procedure.

Public notary (javni beležnik)

A legal expert with public authority who draws up notarial documents and performs the certification of real estate sale contracts, which is a legal requirement for registering rights from that contract in the real estate cadastre.

Real estate cadastre (katastar nepokretnosti)

A public record of real estate and the rights held over it, maintained by the Republički geodetski zavod (Republic Geodetic Authority). It contains data on the position, shape, and area of cadastral parcels, buildings and separate parts of buildings, as well as ownership rights, other real rights, encumbrances, and restrictions on them.

Real estate title deed (list nepokretnosti)

The basic document on real estate and registered ownership rights in Serbia (referred to in law since 2023 as an extract from the real estate cadastre database), which is downloaded electronically or certified by a public notary. The record is structured into four basic parts (A, B, V, and G sheets) containing data on the land, the holder of rights to the land, buildings and their owners, as well as encumbrances such as mortgages.

Reconstruction (rekonstrukcija)

The execution of construction and other works on an existing building within its footprint and volume that affect the fulfilment of basic requirements for the building, change the technological process, change the external appearance of the building, increase the number of functional units, or involve the replacement of devices, plants, equipment, and installations with an increase in capacity.

Remediation (sanacija)

Construction works on a damaged building for the purpose of its repair and restoration to a functional and safe condition.

Residential community (stambena zajednica)

A legal entity consisting of all owners of separate parts, specifically flats, business premises and garages in a residential or residential-commercial building, for the purpose of management and maintenance.

RHMZ (Republic Hydrometeorological Service of Serbia)

The Republic Hydrometeorological Service of Serbia, a special organisation within the state administration that performs meteorological and hydrological tasks, monitors weather, climate, and water conditions, and issues early announcements and warnings for natural disasters.

Serbian Chamber of Engineers (Inženjerska komora Srbije)

A professional organisation to which the line ministry may entrust professional and administrative tasks related to issuing licences and maintaining registers of licensed engineers, architects, planners and other technical experts. Abbreviated as IKS.

Sewerage (kanalizacija)

A system of pipes for draining waste water. If one does not exist, an impermeable septic tank is built.

Spatial plan (prostorni plan)

A strategic document determining long-term spatial development goals. It defines land use and infrastructure systems.

Technical conditions (tehnički uslovi)

Conditions for design or connection issued within the unified procedure by holders of public authority as part of the location requirements, while general technical rules are prescribed by the relevant ministries and system operators.

Technical control (tehnička kontrola)

A professional check of the project for a building permit carried out at the investor's request by an independent company, another legal entity or an entrepreneur to verify compliance with location requirements, laws and technical regulations, the stability and safety of the building, as well as the impact on the environment and neighbouring buildings.

Technical inspection (tehnički pregled)

The procedure verifying that completed works comply with the building permit and that the building is fit for use in order to obtain a use permit. For category A family homes, a certificate from a licensed professional is submitted instead of a technical inspection.

Unified procedure (objedinjena procedura)

The statutory electronic procedure through CEOP in which the competent authority obtains conditions from holders of public authority ex officio and handles location conditions, building permits and use permits.

Urban planning inspection (urbanistička inspekcija)

An authority that performs inspection supervision over the legality of the preparation and adoption of planning documents, as well as over the compliance of location requirements, urban planning projects and parcellation or reparcellation projects with the planning documents.

Urban planning project (urbanistički projekat)

An urban-technical document which, for the purposes of the urban-architectural elaboration of a location, details one or more cadastral plots and which, after a public presentation, is confirmed by the competent authority before the issuance of location requirements.

Use permit (upotrebna dozvola)

A decision by which the competent authority confirms that the building was constructed in accordance with the building permit and is suitable for use after a technical inspection has been performed, or on the basis of a certificate from an authorised person for category A buildings. Upon legal finality, it serves as the basis for ex officio registration of the building and ownership in the real estate cadastre.

Useful area (korisna površina)

The part of a building's net area (under standard SRPS U.C2.100) directly serving the primary function of the building (such as rooms, kitchen and bathroom), excluding technical rooms and circulation areas (corridors and staircases).

VAT on new construction (PDV na novogradnju)

Value added tax paid on the first transfer of disposal rights to a newly built structure when the seller is a VAT taxpayer (at the reduced 10% rate for residential buildings). First-time home buyers are eligible for a VAT refund under statutory conditions.