LynxCraft · Academy
← Glossary of termsThe Croatian design that works the building out to meet the essential requirements (structure, fire safety, energy and so on), with architectural, structural, electrical and mechanical parts (Zakon o gradnji, NN 155/25, Art. 34). For larger buildings it is filed with the building permit application. For a less complex building (manje složena zgrada), which covers most family houses, it has been drawn up after the permit since 1 January 2026: the investor attaches it to the notice of commencement of works (Art. 89) and it must be kept on site.