LynxCraft Alderley Edge Start your design
Alderley Edge
Designed with Lynx Copilot

Alderley Edge

1,016 m² plot/Designed in LynxCraft
227.7 m²Net living area
£561,986Estimated investment
21 mo.To move-in
01 Design

What you see

The concept design is a complete presentation that connects the land, the spatial plan and your living needs into a concrete house proposal.

It covers the placement on the plot, a feasibility study, the project timeline and an estimate of the total investment.

Plot1,016 m²
Gross floor area266.6 m²
Net living area227.7 m²
StoreysG + 1
Estimated investment£561,986
02 Exterior

How it will look

1 visualisations
Visualisation 1
Visualisation 1
04 Plot

Where it stands

Plot size1,016 m²
Parcel number21478858
Cadastral municipalityGB
Where it stands —Where it stands —
06 Investment

What it costs

Estimate as of the design date
Try on your parcel to get the full data
07 Timeline

Construction process

21 months from this design to the occupancy permit.

The timeline is an indicative estimate calculated from the data known about your plot and house. The actual duration depends on how the administrative procedures run, how complete the documentation is, which contractor you choose and the conditions on site.

Commission surveys (topo, ground)0.7 mo.
Feasibility study0.9 mo.
Pre-application advice1.4 mo.
Planning application pack0.9 mo.
Submission & validation (LPA)0.2 mo.
Planning determination2.5 mo.
Discharge of pre-commencement conditions1.4 mo.
Building Regulations approval1.4 mo.
Technical design & tender documentation1.8 mo.
Tendering & contractor selection1.1 mo.
CIL exemption claim & commencement notice0.5 mo.
Mobilisation0.5 mo.
LynxCraft

Create your own concept design

Enter your plot and how you want to live. The system draws the volume, the floor plan and the investment estimate — the same way this design was made.

Start your design
First design is freeResult in 20 minutesNo obligation